- 1. Quality of workmanship and the material used on the project are set to the highest standards and any deviation from deviate specifications layout by the consultant is not permitted.
- 2. Prior approvals for all the material shall be obtained prior to ordering.
- 3. All the documentation and correspondence between NASEEM AL BATINAH and the client shall be submitted timely and proper records shall be maintained.
- 4. Site area, Office and material yard shall be kept neat and tidy.
- 5. All the workers shall be properly dressed in company overalls, and shall be provided with safety shoes, safety helmets, and protective glasses.
- 6. All correspondence between the contractor’s representative and the company shall be properly recorded and kept handy on the site.
- 7. Periodical checks shall be carried out to ensure the quality of works. Necessary incentives are introduced to encourage the workers to maintain the desired quality.
- 8. The quality of equipment used on the worksite shall be specified by the tender. The equipment shall be worthy to perform safely & efficiently.
- 9. The workmanship under the contract shall be of high quality.
- 10. The contractor shall provide quality fabrication, installation services adhering to the preparer standards.
